Here's the bonus room's cement floor. We had to put some KILZ on several "Dog" spots.



We got a cool surprise when the carpet was installed. The existing pad ended up being a No. 10, better than what we were going to put in. We still had to replace the pad downstairs though, so that had a No 8, but we were pretty excited about that.
Showing posts with label remodel. Show all posts
Showing posts with label remodel. Show all posts
Monday, February 22, 2010
Job # 3 Getting all the carpet up
In a way to save money, we told our Carpet supplier that we would pull up our own carpet before they installed the fresh new clean smelling carpet. 
Mike did most of this work. We had ordered a No. 8 carpet pad and after taking off the old carpet, noticed that the pad underneath seemed to be in really good condition and a No. 8 pad. So in an effort to save even more money, we decided to keep the pad and just install the new carpet on top.
Job #2 Paint, Paint and More Paint
White Ceilings and Eggshell colored Walls
Taking a break....
Anyways, while many times we worked late into the night with Decker there, we had to figure out a way to keep him off of wet walls, fingers out of paint, and put him to bed when he got tired.
We made a little bed for him in the hall closet with some extra blankets. He didn't seem to mind-- and was tired enough that he would lay down and go to sleep.
And did I say? I'm tired of painting....
Saturday, February 20, 2010
Job #1 Dry wall and Ceiling
I was amazed at how dark and dirty the popcorn was and how fresh and clean a newly textured ceiling was.
These two pictures show where there used to be a wall separating the kitchen from the rest of the living space. We decided to get rid of the remnants and make it all one smooth transition.

Here is the lovely laundry room without a ceiling and a sliding door that has a hole in it on the other side.
Now it has a ceiling! Yeah! Good bye spiders and other creatures with more than 2 legs!
Here Mike and Heath are framing a new door to our laundry room...
and filling in a door space that made no sense going into the laundry room. It opened right smack into the water heater with barely enough room to get by.
Some of the additional repairs, holes in the walls etc...
this space is under the stairs. The previous owners dog spent some time in here..chewing and clawing..it's all gonna go. ;)
It's pretty exciting to see the changes and updates...can't wait till it's all ready to move in!
Subscribe to:
Posts (Atom)